Bathroom Remodeling & Tile Installation in Johns Island, SC
Johns Island is growing fast and the bathrooms are catching up. We handle full remodels and precision tile work from the Maybank corridor out to the marsh-front lots near Kiawah River.
- 100+ Projects
- 1-Year Warranty
- Licensed & Insured
- On-Time Delivery
Bathroom remodeling on Johns Island, from Maybank to the marsh
Johns Island has changed more in the past decade than almost anywhere in Charleston County. New neighborhoods keep going in along Maybank Highway and around the Kiawah River development, while a mile away sit houses that have been on the same family land since long before the Angel Oak had a parking lot. Both kinds of home need bathrooms that work.
The newer projects are usually about ambition. Owners lived with the standard finish package for a year or two and now want a real primary bath: a curbless shower, large-format porcelain, a soaking tub with room to walk around it. Out toward Bohicket and the marsh the work is different, and we often rebuild the floor before we can even discuss tile.
Living this close to Kiawah and Seabrook, clients here have seen what careful finish work looks like. We build to that standard, and we will not pretend a shortcut is a technique.
Rated 5.0 from 8 reviews on Google. Read what our clients wrote.
What We Do in Johns Island
Complete bathroom rebuilds for Johns Island homes, new construction and older properties alike. One crew from demolition through the final walkthrough.
Curbless showers, large-format porcelain, marble and mosaic detail. Set flat, joints even, layout planned before the first tile is cut.
Backsplash installation and kitchen tile updates across Johns Island. Most jobs finish in one to two days with very little disruption to the house.
Marsh-side homes often hide soft subfloor under old tile. We remove what has failed and rebuild a surface actually worth tiling.
Marsh air finds the weak spot.
Live on Johns Island long enough and you learn what the humidity does. Doors swell, paint gives up, and a bathroom tiled without a real waterproofing layer starts to smell before it ever starts to leak. The tile is rarely the culprit. What sits behind it usually is.
Every remodel we build includes waterproofing as part of the work: sloped pan, membrane, corners sealed, penetrations treated. We do not price it separately, because a shower built without it is not a finished shower.
Material choice carries weight out here too. Porcelain handles the moisture without complaint. Stone is worth it when a client wants stone, provided it is sealed and maintained, and we will say so plainly rather than steering you toward the more expensive option by default.
Four steps, zero surprises.
01 / Consultation and Vision
We drive out to Johns Island, look at the room, and talk through what you want it to become. The visit costs you nothing.
02 / Clear Proposal
A written proposal follows with materials, labor, timeline and a total that does not move.
03 / Precision Execution
Demo, substrate, waterproofing, tile, finish, in that order. Three days for a small bath, 4 to 5 medium, 6 to 7 large.
04 / Final Inspection and Warranty
We review the work with you joint by joint, and your 1-year labor warranty starts the day we finish.
Durability is not a promise. It is built into every tile we lay.
1-Year Labor Warranty
A full year of coverage on the labor in your remodel. If any part of the installation does not hold the way it should, we come back out and put it right.
3-Year Materials Warranty
Three years on the waterproofing and preparation systems. Those materials sit out of sight under tile and behind walls, doing the work that keeps moisture where it belongs.
Johns Island is an easy run for our crew, and it stays that way after the job is paid for. One call and we are back out to look at it.
Questions from Johns Island homeowners
Yes, regularly. We are based in Charleston and Johns Island sits well inside our service area, from the Maybank Highway corridor out toward Bohicket and the Kiawah River side of the island. No travel surcharge is added.
A small bathroom takes 3 days. Medium bathrooms run 4 to 5 days and large primary baths take 6 to 7. Older island homes sometimes need an extra day for subfloor repair, which we identify during demolition and discuss with you before continuing.
Most of Johns Island falls under Charleston County or the City of Charleston, depending on the address. Replacing tile, fixtures and a vanity in the same footprint typically needs no permit, while moving plumbing or electrical does. We sort out which agency applies during the consultation.
It affects the build more than the tile. Porcelain is the safest option because it barely absorbs water, though marble and other stone perform well once sealed. The waterproofing system behind the surface is what keeps marsh air out of your framing.
We measure the space, look at the existing plumbing and substrate, talk through materials and layout, then follow up with a written proposal. There is no fee, and no obligation to hire us afterward.
Nearby service areas. We also remodel bathrooms in Mount Pleasant, Summerville and Daniel Island, and we offer tile installation in Johns Island. For the full metro area, see bathroom remodeling in Charleston, SC.
Let us build the bathroom your Johns Island house deserves.
Free consultation, clear written pricing, and finish work you will still be happy with in ten years.
Serving Johns Island and the greater Charleston area · Licensed & Insured in South Carolina